Contents | Index | Previous | Next
Midnight routine operation
Overlay 33 can be scheduled to run at midnight if included in midnight
routines. The following actions take place during midnight operation:
- Send Time of Day message to loadware (L/W).
- Print performance monitoring report.
- Run non-service-impacting test on the standby link.
- Run MNSN and MNSP commands to cause protection switching. When these commands
are run, continuity tests check both links alternately.