Contents | Index | Previous | Next

Midnight routine operation

Overlay 33 can be scheduled to run at midnight if included in midnight routines. The following actions take place during midnight operation:

  1. Send Time of Day message to loadware (L/W).

  2. Print performance monitoring report.

  3. Run non-service-impacting test on the standby link.

  4. Run MNSN and MNSP commands to cause protection switching. When these commands are run, continuity tests check both links alternately.