Contents | Index | Previous | Next
TEST 100 x
pra-13
Perform interrupt generation test on DCHI x. This is an isolated hardware
test. If this test fails, either a faulty DCHI card or a contention problem is
indicated.
Tests 100, 101, 200, and 201 must be run in sequential order. Established
calls will stay up, but new calls cannot be placed. The DCH link must be in the
reset (RST) state when these tests are run. Reset (RST) can be established when
the status of the D-channel is established (EST) or released (RLS).